Industry Guide

Piping Software for EPC Contractors

A technical comparison of piping MTO software, material management systems, and procurement platforms for Oil & Gas EPC projects. From piping estimating to bid tabulation.

The Problem with Piping Procurement

20% of project CAPEX. 50% of engineering hours. 70% of quality costs.

The Core Issue with Piping Software

SAP, Ariba, AVEVA ERM, Hexagon Smart Materials all move documents and track materials. None of them understand piping specifications semantically. Traditional piping MTO software manages lists, not meaning.

A "6 inch seamless A106B" pipe, a "TUBO S/S 6" DN150," and a "168.3x7.11 SMLS" are the same product. Without automatic normalization, they become three different material codes in your ERP, three different line items in your bid tabulation, and zero visibility into historical spend. No piping estimating software on the market solves this.

This is why every EPC ends up in Excel. Even with million-dollar piping management software investments, procurement teams still copy-paste supplier quotes into spreadsheets for bid tabulation.

Export from 3D

Manual MTO extraction

150+ Emails

Per RFQ cycle

4-6 Weeks

RFQ to award

EPC Software Landscape: Four Categories

Each solves a different slice of the problem. Know the battery limits.

Category 1

Lifecycle Material Management

What it does
  • End-to-end lifecycle tracking
  • 3D CAD integration
  • Warehouse management
What it does NOT do
  • Auto-normalize supplier descriptions
  • Real-time LME pricing
  • Automated bid tabulation
Key limitation: Catalog-based matching requires manual setup. Cannot parse free-text supplier descriptions.
Category 2

ERP Procurement Modules

SAP MM Oracle Procurement Cloud
What it does
  • Financial control & audit trail
  • Corporate spend visibility
  • Approval workflows
What it does NOT do
  • Validate piping specs
  • Normalize material codes
  • Fast MTO revision handling
SAP Problem: New material code = 28 days approval, 18-40% error rate
Category 3

Sourcing Platforms

SAP Ariba Coupa Ivalua
What it does
  • Supplier relationship mgmt
  • Indirect spend optimization
  • Contract lifecycle
What it does NOT do
  • Understand piping specs
  • Handle complex BOMs
  • Track MTO revisions
Ariba Gap: BOMs are static files, no revision tracking
Category 4

Site Logistics & Material Readiness

Jovix Track'em
What it does
  • Real-time site tracking
  • Workface planning
  • RFID/barcode scanning
What it does NOT do
  • Upstream procurement
  • Quote management
  • Bid evaluation
Focus: Construction site, not procurement

What No Piping Software Can Do Today

Parse free-text supplier descriptions
Normalize piping MTO across languages
Automatic TBE/CBE generation
Real-time piping estimating from LME

This is exactly what Projectmaterials does. The only piping software with semantic normalization.

Shell MESC: The Industry Reference

Material and Equipment Standards and Code. The most comprehensive piping catalog.

What is MESC?

Shell's Material and Equipment Standards and Code (MESC) is a comprehensive catalog of over 500,000 piping products with standardized descriptions. Developed over decades, it's the de facto reference for material classification in Oil & Gas.

Many EPCs and operators use MESC codes as their internal standard. The challenge: suppliers don't quote in MESC format, and mapping free-text descriptions to MESC codes is manual, error-prone work.

500K+
Product codes
50+ years
Industry standard
Global
Adoption
MESC is a catalog, not software

MESC provides the classification system. You still need tools to manage RFQs, normalize supplier quotes, and generate bid tabulations. Our engine can map to MESC codes automatically.

Big Bang vs. Sidecar

Two implementation philosophies. The most important decision is not which vendor.

Big Bang

Replace everything

  • Replace or deeply integrate with existing ERP
  • Migrate historical data into new system
  • Retrain procurement, engineering, construction
  • Convince suppliers to use another portal
Timeline
12-24 months
Cost
$500K-$5M+
AVEVA ERM Hexagon SAP Oracle Ariba Coupa

Sidecar

Complement existing systems

  • Keep existing ERP as financial system of record
  • Keep existing 3D CAD for design and MTO
  • Add specialized layer for normalization & bid automation
  • Export results to SAP/Oracle when ready
Timeline
Days to weeks
Cost
Subscription
Projectmaterials

Piping Software Comparison

Side-by-side capabilities: piping MTO management, estimating, and procurement automation.

Capability AVEVA / Hexagon SAP / Ariba Projectmaterials
Technical Normalization Catalog-based (manual) None Automatic (3M products)
Bid Tabulation Manual or add-on Manual Automatic TBE/CBE
Error Rate 5-10% 18-40% <1%
RFQ-to-Award Cycle 3-4 weeks 4-6 weeks ~1 week
Implementation Time 6-18 months Already deployed Days
Supplier Portal Cost Paid or complex Ariba Network fees Free for suppliers
LME Price Integration No No Yes
Approach Big Bang Big Bang Sidecar

Different Problems, Different Tools

These are complementary, not alternatives. Many EPCs use both.

AVEVA/Hexagon solves:

  • Material lifecycle tracking
  • 3D model integration
  • Warehouse management
  • MTO revision control
Does NOT parse supplier descriptions

SAP/Oracle solves:

  • Financial control & audit
  • PO and invoice management
  • Corporate spend visibility
  • Approval workflows
Does NOT understand piping specs

Projectmaterials solves:

  • Semantic normalization
  • Automatic TBE/CBE generation
  • Supplier quote parsing
  • Budget pricing from LME
No other tool does this automatically

The Reality Today

EPCs have AVEVA/Hexagon as data repository. But when it comes to bid tabulation...

What happens today
AVEVA
Export
Excel

Manual copy-paste. 4-6 weeks. Errors.

With Projectmaterials
AVEVA
PM
TBE/CBE

Automatic. ~1 week. <1% errors.

AVEVA/Hexagon and Projectmaterials solve different problems. You need both.

Why Piping MTO Software Fails

The normalization gap that no piping design software or ERP can solve.

Same product, different descriptions
US Supplier
6" SMLS PIPE A106 GR.B SCH40 BE
Italian Supplier
TUBO S/S 6" DN150 A106B S40
German Supplier
168.3x7.11 NAHTLOS A106B
Your MTO
PIPE,CS,SMLS,6",SCH 40,ASTM A106 GR B,BE
Output
Unique Product Code PIPE-SMLS-A106-GRB-6-SCH40-ASMEB36.10
ERP Code PIP-7F3A9E2B1C4D8
Budget Price 58 $/meter

In SAP, these become four different material codes. In a manual bid tabulation, someone must recognize they are equivalent. With hundreds of line items per RFQ, this is where errors happen and time disappears.

See How It Works

30-minute demo. No slides, just the actual platform processing real piping MTOs.